Our Work

Recent Concrete Projects

Real jobs delivered across Greater Manchester, Cheshire and the North West — volumetric ready mix, concrete pumping and foundations. Mixed fresh on site, with free barrowing on every pour. Est. 1984.

Case studies

Concrete jobs we’ve completed

Browse recent pours by type of work. Every project was mixed fresh on site and delivered by Barrow Mix across Greater Manchester, Cheshire and the North West.

Barrow Mix concrete pump truck and volumetric wagon at a Sale property with no rear accessPumping
Sale, Greater Manchester

Pumped Through the House — Sale

No rear access, so we ran the pump line straight through the house — and left it spotless.

View case study
Barrow Mix pumped concrete foundations for a Calore Homes housing estate in Thelwall, WarringtonPumping
Thelwall, Warrington

Housing Estate Foundations — Thelwall, Warrington

Over 150m³ of concrete pumped in a single day for the foundations of a Calore Homes housing estate.

View case study
Barrow Mix pumping concrete on a Sunday out-of-hours job in BoltonPumping
Bolton, Greater Manchester

Pumped Concrete in Bolton

An early Sunday out-of-hours base pour with two wagons and the pump, plus 15m³ pumped in for a full set of house floors.

View case study
Pumped concrete being placed for a full set of house floors in BoltonPumping
Bolton, Greater Manchester

Pumped House Floors — Bolton

15m³ pumped in for a full set of house floors — fed straight to each room with no barrowing across the site.

View case study
C35 concrete pumped into footing trenches for apartment foundations in BoltonPumping
Bolton, Greater Manchester

C35 Apartment Foundations — Bolton

120m³ of C35 pumped straight into the footing trenches for a new block of apartments.

View case study
Barrow Mix concrete pumping at San Carlo, Alderley EdgePumping
Alderley Edge, Cheshire

Concrete Pumping at San Carlo — Alderley Edge

Volumetric-mixed and line-pumped the concrete for the outside area at the new San Carlo restaurant.

View case study
Night railway safety fencing concrete work at Manchester Victoria stationPumping
Manchester Victoria

Railway Safety Fencing — Manchester Victoria

Concrete for new safety fencing along the railway at Victoria station — poured overnight so the trains weren’t disrupted.

View case study
Concrete pumped down into the basement of Victoria Mill, Manchester to lay the floorsPumping
Manchester Victoria

Victoria Mill Basement Floors — Manchester

Pumped down into the basement of a landmark red-brick mill to lay all the floors — exactly where a pump earns its keep.

View case study
Barrow Mix concrete base poured and levelled against a brick boundary wall in Colwyn BayBases
Colwyn Bay, North Wales

Concrete Base — Colwyn Bay

Volumetric concrete supplied and laid for a new base — mixed fresh on site and levelled off by hand.

View case study
Early morning concrete delivery to a Wetherspoon development in Colwyn BayBases
Colwyn Bay, North Wales

Early Wetherspoon Delivery — Colwyn Bay

A 6:30am start and a trip beyond our usual patch to keep a regular customer’s Wetherspoon build on schedule.

View case study
Aerial view of a large no-fines concrete driveway being laid by the Barrow Mix team at a modern house in KnutsfordDriveways
Knutsford, Cheshire

30m³ No-Fines Driveway — Knutsford

30m³ of permeable no-fines concrete for a large driveway at a modern Knutsford home — mixed on site, barrowed, raked and compacted by a full team.

View case study
No-fines concrete driveway laid at a country house near KnutsfordDriveways
Knutsford, Cheshire

No-Fines Country-House Driveway — Knutsford

A free-draining no-fines concrete driveway laid at a country house in the Knutsford area.

View case study
New bulk LPG gas tank beside its concrete anchor base at a new build in Mobberley, CheshireBases
Mobberley, Cheshire

Gas-Tank Anchor Base — Mobberley

An unusual one: a concrete anchor base for a buried LPG gas tank at a new build, with anchor plates cast into the slab so it can’t float when the garden’s backfilled.

View case study
Six freshly laid concrete lodge bases at a holiday lodge park in Mobberley, CheshireBases
Mobberley, Cheshire

6 Lodge Bases — Mobberley

Six holiday-lodge bases laid in under five hours — four wagons run back to back, ready for a Sunday lodge delivery.

View case study
Freshly laid concrete base for a greenhouse in a Mobberley gardenBases
Mobberley, Cheshire

Greenhouse Base — Mobberley

A flat, level base for a new greenhouse, mixed fresh and delivered to the garden — cheaper than mixing it by hand.

View case study
Barrow Mix concrete pumping at the Etihad Stadium, Manchester CityPumping
Etihad Stadium, Manchester

Concrete Pumping at the Etihad — Manchester City

Supplying and pumping the concrete for a large hot tub base at the Etihad Stadium — volumetric-mixed and placed by line pump where the wagon couldn’t reach.

View case study
A smooth concrete dog run laid at a kennels in Millington near LymmBases
Millington, near Lymm

Dog Run at a Kennels — Millington

A concrete dog run at a kennels we’ve worked with for over 20 years — footings through to a floated finish.

View case study
Three Barrow Mix wagons on the new eight-townhouse site in Lymm CheshireFoundations
Lymm, Cheshire

New-Build Footings — Lymm

Footings for eight new townhouses on Sandy Lane — three of our wagons pouring at once.

View case study
A deep reinforced footing with the Barrow Mix boom pump hose dropping into the trenchPumping
North West

Boom Pump to a Footing — Access Assessed

Site visit — barrow or pump? A deep reinforced footing where the boom pump was the only way to reach it.

View case study
A long concrete base laid down a back garden in Cuddington ready for a pigeon loftBases
Cuddington, Cheshire

Pigeon Loft Base — Cuddington

A big concrete base laid down the back garden for a pigeon loft — mixed on site and barrowed down.

View case study
Barrow Mix boom pump reaching over a street to fill retaining-wall shuttering between two housesPumping
North West

Retaining Wall Boom Pump — Tight Access

Boom-pumping a retaining wall between two houses with an inch to spare — precision from our driver on the boom.

View case study
The pride of the Barrow Mix fleet freshly washed, delivering to Michaels MarbleBases
Michael’s Marble, North West

Michael’s Marble — 15-Year Customer

Delivering hardcore and concrete for 15+ years — and helping lay it in extreme heat. Another happy customer.

View case study
Barrow Mix concrete pump line running along a garden path to a base at the back of a Wilmslow gardenPumping
Wilmslow, Cheshire

Pumped Concrete Base — Wilmslow

Concrete pumped to a base at the back of the garden — line run past the house where a barrow couldn’t reach. If we can’t barrow it, we pump it.

View case study
Barrow Mix supplying concrete at a multi-storey new build in Deansgate, with the external hoist running up the scaffolded towerFloors
Deansgate, Manchester

Multi-Storey New Build Floors — Deansgate

Concrete floors on every level of a city-centre multi-storey new build in Deansgate — every load barrowed up by the site hoist, floor by floor.

View case study
Finished concrete base inside the new fenced waste bin store at Krispy Kreme in Trafford ParkBases
Trafford Park, Manchester

Bin Store Base, Krispy Kreme — Trafford Park

A new concrete base for the waste bin store at Krispy Kreme in Trafford Park — a hard-wearing slab mixed fresh on site and tamped to a brushed finish.

View case study
Barrow Mix volumetric concrete trucks and team laying the new weighbridge base in SalfordBases
Salford, Greater Manchester

Weighbridge Concrete Base — Salford

25m³ of concrete laid for a new commercial weighbridge base in Salford — mixed on site, poured and tamped level, on a Saturday morning out-of-hours.

View case study
Barrow Mix volumetric concrete truck on the new-build plot in MiddlewichFoundations
Middlewich, Cheshire

Piled Raft Foundation — Middlewich

Volumetric concrete for the piled foundations of a new build on poor ground — barrowed into every pile head, with cube samples taken for independent strength testing.

View case study
Ian Grainge of Barrow Mix with Tyson Fury at the Fury family bungalow refurb in GawsworthFloors
Gawsworth, Cheshire

Fury Family Bungalow Floors — Gawsworth

All the concrete floors laid in a refurb bungalow for the Fury family — 3 hours flat, theodolite-levelled, barrowed into the tight spaces. Tyson Fury popped by to say thanks.

View case study
Barrow Mix truck inside the East Lancashire Railway maintenance depotDriveways
East Lancashire Railway, Bury

East Lancashire Railway Depot

Concrete hardstanding for the depot where they maintain vintage trains like Thomas and the Flying Scotsman — laid and floated smooth. Six-plus years supplying them.

View case study
Barrow Mix boom pump filling fence post holes in SkelmersdalePumping
Skelmersdale, Lancashire

Fence Post Holes — Skelmersdale

Boom pump used to fill the holes for a run of new fencing on a Skelmersdale site — concrete straight into each hole, no barrowing.

View case study
Barrow Mix concrete trucks and pump for a rear extension pour in BramhallPumping
Bramhall, Stockport

Rear Extension Base — Bramhall

A large reinforced rear-extension base, pumped in because access wasn’t good — the pump reached over and around the house to the back.

View case study
Pouring concrete into a house extension footing in Marple BridgeFoundations
Marple Bridge, Stockport

Extension Footing — Marple Bridge

A large footing for a house extension — 14m³ of ready-mixed concrete went straight into the trenches in an afternoon.

View case study
Finished no-fines concrete base by the reception of a Warrington office blockBases
Warrington, Cheshire

No-Fines Base — Warrington Office

A no-fines base for resin at an office block — permeable because there are no drains, laid out-of-hours on a Saturday to suit the customer.

View case study
Boom pump pouring concrete for apartment foundations at Edgewater View, StretfordPumping
Stretford, Greater Manchester

Apartment Foundations — Stretford

Phase 2 of the canalside Edgewater View apartments — boom-pumped due to tight access, 95m³ placed in just 4 hours.

View case study
Concrete poured into new-build strip foundations with a Barrow Mix truck in NorthwichPumping
Northwich, Cheshire

New-Build Foundations — Northwich

The access drive was too tight for a boom pump, so we ran a line pump up the drive to feed the new-build strip foundations directly.

View case study

No projects in this category yet.

Planning a job like these?

Tell us what you need and where. We’ll mix it fresh on site and get it exactly where it has to go — barrowed or pumped. Free quotes across the North West.