Freephone: 0800 074 0442

Manchester: 0161 748 4500

Cheshire: 01565 734 111

Bolton / Wigan: 01942 722 629

Project · Concrete bases

Concrete Bases in Mobberley

Mobberley, Cheshire

We lay concrete bases of every size across Mobberley and the wider Cheshire area, mixed fresh on site with our volumetric wagons — from six holiday-lodge bases against the clock to a single garden greenhouse base. Two recent Mobberley jobs:

LPG gas tank base

An anchored concrete base for a buried LPG gas tank

This was a more unusual job than most. A new-build home in the Mobberley area of Cheshire was having a bulk LPG gas tank installed in the back garden, and the tank needed to be buried and then backfilled over with soil. A buried tank wants to float upwards when the ground around it is filled back in — so it can’t simply rest on a slab, it has to be anchored down to something solid.

We laid a concrete base in the bottom of the excavation with anchor plates set into the concrete, giving the installers fixed points to strap the tank down to. Once the base had cured and the tank was strapped in, the garden could be backfilled with soil without the tank lifting or shifting.

It’s exactly the kind of one-off, awkward-access pour our volumetric mixer handles well — concrete mixed fresh on site and placed straight into the pit, at the right strength, with only as much used as the job actually needed. Thanks for the business.

  • Anchor plates cast into the concrete base to strap the tank down
  • Stops the buried tank floating up when the garden is backfilled with soil
  • Concrete placed straight into a deep, tight excavation beside the house
  • Volumetric mix — right strength, right amount, mixed fresh on site
Job
Gas-tank base
Location
Mobberley, Cheshire
Detail
Anchor plates cast in
Supply
Volumetric, on site

6 photos — tap to enlarge

Lodge bases

Six lodge bases in under five hours

A holiday lodge park in Mobberley, Cheshire needed the bases in for six new lodges — and with the lodges booked to be delivered and fitted that Sunday, the concrete couldn’t wait. Barrow Mix laid all six bases in under five hours, the same day.

We ran four wagons to keep it flowing, loading up and out to site one after another for a customer we’ve looked after for over 20 years, on jobs all over the North West. Mixed fresh on site, poured and levelled off — even the management were out with floats to get it finished to the deadline.

And as on every job, we washed and cleaned the roads down on our way out.

  • Six concrete bases for new holiday lodges, all laid in under five hours the same day
  • Four wagons run back to back to hit the deadline — the lodges were being delivered and fitted the Sunday
  • A regular customer of over 20 years — one of many jobs we’ve done for them across the North West
  • Mixed fresh on site, poured and levelled off by the team — management included
  • Roads washed down and the site left spotless, as on every Barrow Mix job
Bases
6 lodges
Time
< 5 hours
Wagons
4, back-to-back
Finish
Poured & levelled
Barrow Mix laying six lodge bases in Mobberley
Greenhouse base

A greenhouse base — cheaper than mixing it by hand

When Mike in Mobberley needed a solid, level base for his new greenhouse, he was all set to buy the materials and mix the concrete by hand himself. After a quick chat he realised that having it supplied ready-mixed by Barrow Mix actually worked out as the cheaper option — and a great deal less back-breaking.

We delivered the concrete straight to his garden and helped him lay and finish the base, leaving a smooth, even slab ready for the greenhouse to sit on top. It’s a small domestic job, but it gets exactly the same fresh, mixed-on-site service as our largest commercial pours — no job is too big or too small for Barrow Mix.

Cheers Mike for the business.

  • Worked out cheaper than buying bags of cement and aggregate to mix by hand
  • Concrete mixed fresh and delivered straight to the garden — no waste, no hire
  • We helped lay and finish the base for a smooth, level slab
  • No job too big or too small — same service as our commercial pours
Job
Greenhouse base
Vs DIY
Beat hand-mixing
Delivery
To the garden
Finish
Smooth, level slab

5 photos — tap to enlarge

Concrete bases in Mobberley — FAQs

Can you lay several concrete bases in a single day?

Yes – on this Mobberley job we laid six lodge bases in under five hours the same day, running four wagons back to back to hit the customer’s deadline.

Do you supply concrete for holiday lodge and park home bases?

Yes – we mix fresh on site and lay bases for holiday lodges, park homes, static caravans and garden buildings across Cheshire and the North West.

Is ready-mixed concrete cheaper than mixing it yourself?

Often, yes. Once you add up bags of cement and aggregate, tool hire and your own time, ready-mixed frequently works out cheaper — and gives a consistent strength and finish. That’s exactly what Mike found on this greenhouse base. We’ll give you a free, no-obligation quote so you can compare.

Do you deliver small loads of concrete in Mobberley?

Yes — no job is too big or too small. Our volumetric mixers batch fresh on site, so you order only what you need with no waste, and free barrowing is included on every delivery across Mobberley and the surrounding Cheshire and Manchester areas.

Which areas near Mobberley do you cover?

We supply ready-mixed concrete across Mobberley, Knutsford, Wilmslow and the wider Cheshire and Greater Manchester area. See our Mobberley concrete page for more.

★★★★★

Had concrete from us?

A quick Google review helps other people around Mobberley and Cheshire find us. Thank you!

Leave a Google review

Need a concrete base in Mobberley?

Shed, garage, garden-room, greenhouse, lodge and commercial bases — mixed fresh on site and laid level, across Mobberley, Cheshire and the North West. Free quotes.