Real jobs delivered across Greater Manchester, Cheshire and the North West — volumetric ready mix, concrete pumping and foundations. Mixed fresh on site, with free barrowing on every pour. Est. 1984.
Browse recent pours by type of work. Every project below was supplied and delivered by the Barrow Mix team.
Domestic
A big concrete base laid down the back garden for a pigeon loft — mixed on site and barrowed down.
View case study →
Pumping
Boom-pumping a retaining wall between two houses with an inch to spare — precision from our driver on the boom.
View case study →
Commercial
Delivering hardcore and concrete for 15+ years — and helping lay it in extreme heat. Another happy customer.
View case study →
Pumping
Concrete pumped down into the basement of a landmark mill to lay all the floors — reaching where no wagon could.
View case study →
Commercial
Six concrete bases for new holiday lodges laid in under 5 hours — 4 wagons run back to back, site left spotless.
View case study →
Pumping
Concrete pumped to a base at the back of the garden — line run past the house where a barrow couldn’t reach. If we can’t barrow it, we pump it.
View case study →
Volumetric
Volumetric concrete supplied and laid for a new base — mixed fresh on site and levelled off by hand.
View case study →
Commercial
120m³ of C35 pumped into the footings for a new apartment block — supplied, pumped and laid for the builder.
View case study →
Commercial
A 6:30am start and a trip out to North Wales for a regular customer — two wagons supplying a Wetherspoon pub site, poured and away by 8:20. Another happy customer.
View case study →
Commercial
Concrete floors on every level of a city-centre multi-storey new build in Deansgate — every load barrowed up by the site hoist, floor by floor.
View case study →
Commercial
A new concrete base for the waste bin store at Krispy Kreme in Trafford Park — a hard-wearing slab mixed fresh on site and tamped to a brushed finish.
View case study →
Commercial
25m³ of concrete laid for a new commercial weighbridge base in Salford — mixed on site, poured and tamped level, on a Saturday morning out-of-hours.
View case study →
Domestic
30m³ of permeable no-fines concrete for a large driveway at a modern Knutsford home — mixed on site, barrowed, raked and compacted by a full team.
View case study →
Pumping
15m³ of concrete pumped in for all the floors of a house refurb in Bolton — our experienced lads helping the customer lay and level every room.
View case study →
Commercial
Volumetric concrete for the piled foundations of a new build on poor ground — barrowed into every pile head, with cube samples taken for independent strength testing.
View case study →
Residential
All the concrete floors laid in a refurb bungalow for the Fury family — 3 hours flat, theodolite-levelled, barrowed into the tight spaces. Tyson Fury popped by to say thanks.
View case study →
Commercial
Concrete hardstanding for the depot where they maintain vintage trains like Thomas and the Flying Scotsman — laid and floated smooth. Six-plus years supplying them.
View case study →
Concrete Pumping
Boom pump used to fill the holes for a run of new fencing on a Skelmersdale site — concrete straight into each hole, no barrowing.
View case study →
Concrete Pumping
A large reinforced rear-extension base, pumped in because access wasn’t good — the pump reached over and around the house to the back.
View case study →
Domestic
A large footing for a house extension — 14m³ of ready-mixed concrete went straight into the trenches in an afternoon.
View case study →
Commercial
Concrete for new safety fencing along the railway at Victoria station — poured overnight so the trains weren’t disrupted.
View case study →
Commercial
A no-fines base for resin at an office block — permeable because there are no drains, laid out-of-hours on a Saturday to suit the customer.
View case study →
Domestic
A free-draining no-fines concrete driveway at a country house — our drivers got the mixer down a tight, narrow lane to reach it.
View case study →
Commercial
Phase 2 of the canalside Edgewater View apartments — boom-pumped due to tight access, 95m³ placed in just 4 hours.
View case study →
Concrete Pumping
The access drive was too tight for a boom pump, so we ran a line pump up the drive to feed the new-build strip foundations directly.
View case study →
Domestic
Mike was going to mix it by hand — until he found ready-mix from us was cheaper. We delivered and helped lay a smooth, level greenhouse base.
View case study →Tell us what you’re pouring and where — we’ll quote the right mix and delivery. Same-day availability across the North West.