Freephone: 0800 074 0442

Manchester: 0161 748 4500

Cheshire: 01565 734 111

Bolton / Wigan: 01942 722 629

Our Work

Recent Concrete Projects

Real jobs delivered across Greater Manchester, Cheshire and the North West — volumetric ready mix, concrete pumping and foundations. Mixed fresh on site, with free barrowing on every pour. Est. 1984.

Case Studies

Concrete Jobs We’ve Completed

Browse recent pours by type of work. Every project below was supplied and delivered by the Barrow Mix team.

A long concrete base laid down a back garden in Cuddington ready for a pigeon loft Domestic

Pigeon Loft Base — Cuddington

Cuddington, Cheshire

A big concrete base laid down the back garden for a pigeon loft — mixed on site and barrowed down.

View case study →
Barrow Mix boom pump reaching over a street to fill retaining-wall shuttering between two houses Pumping

Retaining Wall Boom Pump — Tight Access

North West

Boom-pumping a retaining wall between two houses with an inch to spare — precision from our driver on the boom.

View case study →
The pride of the Barrow Mix fleet freshly washed, delivering to Michaels Marble Commercial

Michael’s Marble — 15-Year Customer

Michael’s Marble, North West

Delivering hardcore and concrete for 15+ years — and helping lay it in extreme heat. Another happy customer.

View case study →
Barrow Mix wagon outside Victoria Mill pumping concrete for the basement floors Pumping

Basement Floors — Victoria Mill

Victoria Mill, North West

Concrete pumped down into the basement of a landmark mill to lay all the floors — reaching where no wagon could.

View case study →
Six freshly laid concrete lodge bases at a holiday lodge park in Mobberley Cheshire Commercial

6 Lodge Bases — Mobberley

Mobberley, Cheshire

Six concrete bases for new holiday lodges laid in under 5 hours — 4 wagons run back to back, site left spotless.

View case study →
Barrow Mix concrete pump line running along a garden path to a base at the back of a Wilmslow garden Pumping

Pumped Concrete Base — Wilmslow

Wilmslow, Cheshire

Concrete pumped to a base at the back of the garden — line run past the house where a barrow couldn’t reach. If we can’t barrow it, we pump it.

View case study →
Barrow Mix concrete base poured and levelled against a brick boundary wall in Colwyn Bay Volumetric

Concrete Base — Colwyn Bay

Colwyn Bay, North Wales

Volumetric concrete supplied and laid for a new base — mixed fresh on site and levelled off by hand.

View case study →
Barrow Mix pumping C35 concrete for apartment foundations in Bolton Commercial

Apartment Foundations — Bolton

Bolton, Greater Manchester

120m³ of C35 pumped into the footings for a new apartment block — supplied, pumped and laid for the builder.

View case study →
Two Barrow Mix volumetric concrete wagons on site in Colwyn Bay, North Wales Commercial

Above & Beyond — Concrete Delivery to Colwyn Bay

Colwyn Bay, North Wales

A 6:30am start and a trip out to North Wales for a regular customer — two wagons supplying a Wetherspoon pub site, poured and away by 8:20. Another happy customer.

View case study →
Barrow Mix supplying concrete at a multi-storey new build in Deansgate, with the external hoist running up the scaffolded tower Commercial

Multi-Storey New Build Floors — Deansgate

Deansgate, Manchester

Concrete floors on every level of a city-centre multi-storey new build in Deansgate — every load barrowed up by the site hoist, floor by floor.

View case study →
Finished concrete base inside the new fenced waste bin store at Krispy Kreme in Trafford Park Commercial

Bin Store Base, Krispy Kreme — Trafford Park

Trafford Park, Manchester

A new concrete base for the waste bin store at Krispy Kreme in Trafford Park — a hard-wearing slab mixed fresh on site and tamped to a brushed finish.

View case study →
Barrow Mix volumetric concrete trucks and team laying the new weighbridge base in Salford Commercial

Weighbridge Concrete Base — Salford

Salford, Greater Manchester

25m³ of concrete laid for a new commercial weighbridge base in Salford — mixed on site, poured and tamped level, on a Saturday morning out-of-hours.

View case study →
Aerial view of a large no-fines concrete driveway being laid by the Barrow Mix team at a modern house in Knutsford Domestic

30m³ No-Fines Driveway — Knutsford

Knutsford, Cheshire

30m³ of permeable no-fines concrete for a large driveway at a modern Knutsford home — mixed on site, barrowed, raked and compacted by a full team.

View case study →
Barrow Mix team spreading freshly pumped concrete across a house floor in Bolton Pumping

Pumped Concrete House Floors — Bolton

Bolton, Greater Manchester

15m³ of concrete pumped in for all the floors of a house refurb in Bolton — our experienced lads helping the customer lay and level every room.

View case study →
Barrow Mix volumetric concrete truck on the new-build plot in Middlewich Commercial

Piled Raft Foundation — Middlewich

Middlewich, Cheshire

Volumetric concrete for the piled foundations of a new build on poor ground — barrowed into every pile head, with cube samples taken for independent strength testing.

View case study →
Ian Grainge of Barrow Mix with Tyson Fury at the Fury family bungalow refurb in Gawsworth Residential

Fury Family Bungalow Floors — Gawsworth

Gawsworth, Cheshire

All the concrete floors laid in a refurb bungalow for the Fury family — 3 hours flat, theodolite-levelled, barrowed into the tight spaces. Tyson Fury popped by to say thanks.

View case study →
Barrow Mix truck inside the East Lancashire Railway maintenance depot Commercial

East Lancashire Railway Depot

East Lancashire Railway, Bury

Concrete hardstanding for the depot where they maintain vintage trains like Thomas and the Flying Scotsman — laid and floated smooth. Six-plus years supplying them.

View case study →
Barrow Mix boom pump filling fence post holes in Skelmersdale Concrete Pumping

Fence Post Holes — Skelmersdale

Skelmersdale, Lancashire

Boom pump used to fill the holes for a run of new fencing on a Skelmersdale site — concrete straight into each hole, no barrowing.

View case study →
Barrow Mix concrete trucks and pump for a rear extension pour in Bramhall Concrete Pumping

Rear Extension Base — Bramhall

Bramhall, Stockport

A large reinforced rear-extension base, pumped in because access wasn’t good — the pump reached over and around the house to the back.

View case study →
Pouring concrete into a house extension footing in Marple Bridge Domestic

Extension Footing — Marple Bridge

Marple Bridge, Stockport

A large footing for a house extension — 14m³ of ready-mixed concrete went straight into the trenches in an afternoon.

View case study →
Night railway safety fencing concrete work at Manchester Victoria station Commercial

Railway Safety Fencing — Manchester Victoria

Manchester Victoria

Concrete for new safety fencing along the railway at Victoria station — poured overnight so the trains weren’t disrupted.

View case study →
Finished no-fines concrete base by the reception of a Warrington office block Commercial

No-Fines Base — Warrington Office

Warrington, Cheshire

A no-fines base for resin at an office block — permeable because there are no drains, laid out-of-hours on a Saturday to suit the customer.

View case study →
Finished no-fines permeable concrete driveway at a country house near Knutsford Domestic

No-Fines Concrete Driveway — Knutsford

Knutsford, Cheshire

A free-draining no-fines concrete driveway at a country house — our drivers got the mixer down a tight, narrow lane to reach it.

View case study →
Boom pump pouring concrete for apartment foundations at Edgewater View, Stretford Commercial

Apartment Foundations — Stretford

Stretford, Greater Manchester

Phase 2 of the canalside Edgewater View apartments — boom-pumped due to tight access, 95m³ placed in just 4 hours.

View case study →
Concrete poured into new-build strip foundations with a Barrow Mix truck in Northwich Concrete Pumping

New-Build Foundations — Northwich

Northwich, Cheshire

The access drive was too tight for a boom pump, so we ran a line pump up the drive to feed the new-build strip foundations directly.

View case study →
Greenhouse with a freshly laid concrete base in a Mobberley garden Domestic

Greenhouse Concrete Base — Mobberley

Mobberley, Cheshire

Mike was going to mix it by hand — until he found ready-mix from us was cheaper. We delivered and helped lay a smooth, level greenhouse base.

View case study →

Planning a job like these?

Tell us what you’re pouring and where — we’ll quote the right mix and delivery. Same-day availability across the North West.