Fresh, on-site mixed concrete delivered across Salford and the surrounding area — barrowed or pumped exactly where you need it.
Barrow Mix has been supplying concrete across the North West since 1984. We deliver ready-mix and volumetric concrete throughout Salford and nearby areas including Eccles, Swinton, Worsley and Pendlebury — mixing every load fresh on site so there’s no part-load waste, and getting it into place by barrow, line pump or boom pump whatever the access.
Fresh, consistent mixes for foundations, bases, floors and more.
Mixed to order on site — you only pay for exactly what you use.
Our speciality: we barrow concrete into spots a wagon can’t reach.
Concrete pumped through hose to gardens, basements and tight access.
Reach over buildings and across sites with our boom pump.
Smooth, level floor screeds for domestic and commercial builds.
We supplied and poured the reinforced concrete base for a weighbridge at a Salford site — a heavy-duty, dead-level slab engineered to take the constant, repeated load of fully-laden wagons rolling on and off it, day in and day out.
It was volumetric-mixed on site to the exact structural grade specified and poured in one continuous go, so there were no cold joints in the finished slab — and finished dead level to the tolerances a weighbridge needs.
Salford’s commercial yards and depots need precision bases — a weighbridge has to sit dead level to weigh true. We supplied and tamped 25m³ off flat so the deck sat right, strong enough for fully-laden lorries day in, day out.
See the full Salford case study, with photos & video →
Salford straddles the western margin of the coalfield: Pennine Coal Measures underlie the north and west, but toward central Manchester the bedrock passes into Permo-Triassic strata (Sherwood Sandstone and Manchester Marls) — a genuine Salford-specific transition to confirm per site on the viewer. The cover includes glacial and glaciofluvial deposits, thick Irwell/buried-valley fill (20–30 m in places) and extensive made ground.
Part of our Lancashire Coalfield ground guide — see how Salford fits into the wider Greater Manchester Ground Conditions & Foundations Atlas.
Sources: BGS Greater Manchester ground model (OR/20/033); Mining Remediation Authority (Coal Mining Risk Assessment); BGS Geology of Britain viewer. General guidance only — not a substitute for a site-specific ground investigation.
Salford sits on the River Irwell, and Lower Broughton and Kersal have a real flood history — the Boxing Day 2015 floods hit hard, and the area is now protected by engineered flood-storage basins. Worsley Brook adds to the low-ground risk.
If your plot is on the low-lying ground, a Flood Risk Assessment may set a raised floor level and flood-resilient construction — a solid, low-permeability slab over continuous tanking. We pour the specified concrete to suit; the FRA and floor levels come from your designer and building control, not from us.
See flood risk & concrete for what’s required. Check the specific address on the EA flood map for planning — only the low-lying/valley-floor part of the area is affected, not the whole town. General guidance only.
We run our own quarry, wagons and pumps — a genuinely self-sufficient supplier, so we’re not waiting on anyone else to get your concrete to site. See why that matters →
Yes – we deliver ready-mix and volumetric concrete across Salford and nearby areas including Eccles, Swinton, Worsley and Pendlebury, mixed fresh on site to the grade your job needs.
Yes – barrowing is our speciality (it’s in our name), and we run line and boom pumps for back gardens, basements, tight access and over-building reaches across Salford.
Because we mix on site as we pour, there’s no part-load waste – you pay for exactly what you use, not a rounded-up wagon load.
Call us on 0800 074 0442 with your postcode, the grade and roughly how much you need, and we’ll give you a free, no-obligation quote – often same or next day.
Call the yard for a fast, free quote — often same or next day.